Is this bathroom or kitchen remodel quote reasonable?

This page does not say whether any dollar amount is reasonable. It shows how to tell a labor-only figure from the all-in contract price California requires in writing.

Published October 31, 2026. Reviewed against public sources listed below.

A labor-only number is not the contract price

Section 7151 defines a home improvement as repairing, remodeling, altering, converting, or modernizing residential property. A kitchen or bathroom remodel is that kind of work. Section 7159 applies when the aggregate price, including labor, services, and materials, exceeds $500. The agreement can be oral or written and still be a home improvement contract. The statute still requires the contract document described below to be in writing and signed before that work starts.

Section 7159.5 says the contract amount includes the entire cost of the contract, including profit, labor, and materials, and excludes finance charges. A bid that prices labor only, and leaves cabinets, counters, fixtures, tile, or the permit for later, is not that contract amount. Ask each contractor to price the same list. Two numbers are comparable only when they include the same rooms and the same materials.

Published planning figures, labeled as estimates from the sources on those pages, are in the kitchen remodel cost guide and the bathroom remodel cost guide. This page does not use them to say a bid is reasonable or unreasonable.

What the written contract has to include

Section 7159 says the home improvement contract, and any change to it, is in writing and signed by the parties before the work covered by that contract or change order starts. Except where section 7159.5 exempts a bonded contractor, the contract includes:

  • The contractor's name, business address, and license number.
  • The heading "Home Improvement," in at least 10-point bold type.
  • A statement, in at least 12-point bold type, that you are entitled to a completely filled in copy, signed by both you and the contractor, before any work may be started.
  • The heading "Contract Price," followed by the amount in dollars and cents.
  • If there is a finance charge, the heading "Finance Charge," followed by that amount in dollars and cents, separate from the contract amount.
  • The heading "Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed," followed by that description.
  • If a down payment will be charged, a "Downpayment" heading, the amount, and this statement in at least 12-point bold type: "THE DOWNPAYMENT MAY NOT EXCEED $1,000 OR 10 PERCENT OF THE CONTRACT PRICE, WHICHEVER IS LESS."
  • If any payment other than the down payment is due before completion, a "Schedule of Progress Payments." Each payment is in dollars and cents and names the work and materials it covers. The schedule includes a bold statement that it is against the law for a contractor to collect payment for work not yet completed, or for materials not yet delivered, and that a contractor may require a down payment.
  • An approximate start date, including what counts as substantial commencement of work, and an approximate completion date.
  • A note that extra work and change orders become part of the contract only when the order is in writing and signed before that extra work starts, and that the order states the scope, the cost added or subtracted, and the effect on the progress payments.

The same section requires notices, in the contract or as an attachment the contract points to: a commercial general liability insurance notice, a workers' compensation notice, a Mechanics Lien Warning, and a right-to-cancel notice. The cancel notice is the three-day notice, or the five-day notice when the buyer is a senior citizen, unless the contract is negotiated at the contractor's place of business, is the seven-day notice for repair after a declared emergency, or is an alarm-company contract covered by that paragraph. Change orders that skip the written scope, price, and schedule effect are the subject of a separate notice in the same section. The longer explanation, including what this referral will not agree to on a call, is in the contract guide.

Deposit and payments before the work is done

Section 7159.5 says a down payment may not exceed $1,000 or 10 percent of the contract amount, whichever is less. Except for that down payment, the contractor may not request or accept payment that exceeds the value of the work performed or the material delivered. A contractor who has furnished a performance and payment bond, a lien and completion bond, or a bond equivalent or joint control approved by the CSLB registrar is exempt from those down payment and progress-payment limits, and the statute lists what that contractor may leave out of the form. CSLB's hiring guide states the same down payment cap and notes that bond exception. This site does not arrange the payment schedule.

Whether a request for 50 percent up front fits that cap is in is a 50 percent deposit normal in California.

How to compare bids

CSLB's hiring guide says to get at least three identical bids and to check recent similar projects. Identical, on this page, means the same scope: the same rooms, the same materials and equipment, whether the permit fee is included, and whether appliances or fixtures are included or left as allowances. Ask each bidder to mark labor, materials, permit fees, and allowances as separate lines, then to state one contract price that rolls the included lines into the amount section 7159.5 describes. An allowance is not a finished price until the material is chosen and a written change order states the difference.

Concord still requires a building permit for a kitchen remodel and a bathroom remodel, including a replacement, under Information Bulletin IB-022. A quote that omits the permit is not describing the project the city requires. Permit fees depend on the valuation the city sets. The formulas are on the permit fee guide. They are not a quote for your job.

What the city counts as a bathroom remodel Concord project, including a straight replacement, is set out on that page, so you can check each bid describes the same work before you compare the numbers.

Check the license before you treat the number as a bid

Section 7048's exemption for work under $1,000 does not apply when the work requires a building permit. A Concord kitchen or bathroom remodel requires one, so the exemption does not cover that remodel even if someone prices it under $1,000. CSLB's guide also says anyone who contracts for or bids a project of $1,000 or more, labor and materials combined, must be licensed, and that a project needing a permit or workers requires a licensed contractor. Look the license up on the CSLB license check and confirm the license number is the one on the contract. Section 7159 requires that number on the contract.

What this referral will not do

Concord Remodel Guide is an independent referral service, not a contractor, and we never do the work. We do not say a quote is fair, high, or low. We do not quote a price, agree a scope, take a deposit, or book the job. To ask one independent licensed general contractor to follow up, use the request form. The contract, if you sign one, is with that contractor.

Reading a remodel quote

Is this bathroom remodel quote reasonable for the Bay Area, or am I getting ripped off?

This page does not say whether any quote is reasonable, and it does not say anyone is being ripped off. Compare bids that include the same rooms, the same materials, and the same permit. Section 7159.5 says the contract amount includes the entire cost, including profit, labor, and materials, and excludes finance charges. A labor-only number is not that amount.

Is $40k reasonable for a mid range kitchen remodel in Concord CA?

This page does not say whether $40,000 is reasonable. Ask what that figure includes: labor only, or labor, materials, fixtures, and the permit. Section 7159 requires a Contract Price in dollars and cents and a description of the project and of the significant materials and equipment. Published planning figures are on the kitchen remodel cost guide. They are estimates from those sources, not a verdict on this bid.

What must a written bathroom or kitchen contract include under California law?

For a home improvement over $500, section 7159 requires a written contract signed before the work starts. It includes the contractor name, address, and license number, the contract price in dollars and cents, a description of the project and the significant materials and equipment, approximate start and completion dates, the down payment terms if a down payment is charged, a progress-payment schedule if any payment is due before completion, a change-order note, a Mechanics Lien Warning, and a right-to-cancel notice unless an exception in that section applies.

What is the most a contractor can take as a deposit?

Section 7159.5 says a down payment may not exceed $1,000 or 10 percent of the contract amount, whichever is less. Section 7159 requires that sentence in the contract, in at least 12-point bold type, if a down payment is charged. A contractor who has furnished a performance and payment bond, a lien and completion bond, or a joint control approved by the CSLB registrar is exempt from that limit. Except for the down payment, the contractor may not take payment that exceeds the value of the work performed or the material delivered.

Ask a licensed general contractor to follow up

Call or send a request with your address and whether this is a kitchen, a bathroom, or both. We pass your request to one independent licensed general contractor who serves Concord, CA, if one is available.