Can you sell a house in California with an unpermitted kitchen or bathroom remodel?

A bid that calls the permit a waste does not answer the disclosure form, and it does not change Concord's permit rule. This page says what the statutes and the city bulletin say. It is not legal advice, and it is not a prediction of your sale.

Published October 31, 2026. Reviewed against public sources listed below.

What the disclosure form asks

Civil Code section 1102.6 says the disclosures in that article are made on the Real Estate Transfer Disclosure Statement. The Legislature's code site does not paste the form into the online section. It says the form is printed in Statutes of 2020, Chapter 370, pages 34 to 38.

The California Department of Real Estate brochure RE 6, revised 2005, prints the seller questions. In section II, part C, question 4 asks whether the seller is aware of room additions, structural modifications, or other alterations or repairs made without necessary permits. Question 5 asks whether the seller is aware of room additions, structural modifications, or other alterations or repairs not in compliance with building codes. If the answer to any item is yes, the form asks for an explanation. The seller certifies that the information is true and correct to the best of the seller's knowledge as of the date signed. Use the current statutory form for the transaction. This brochure is an older official print of those questions, not a substitute for the statute.

Which sales the statute covers

Section 1102 applies the article to a transfer by sale, exchange, real property sales contract, lease with an option to purchase, any other option to purchase, or ground lease coupled with improvements, of single-family residential property. A waiver of the article is void as against public policy. Section 1102.1 says delivery of the transfer disclosure statement may not be waived in an as is sale.

Section 1102.2 lists transfers the article does not cover, including some court-ordered sales, some foreclosure sales, and some transfers between spouses or co-owners. This page does not decide whether a condo, a duplex, or any other building is single-family residential property under that article. Read section 1102.2 before you assume the form applies.

For a sale the article does cover, section 1102.3 says the seller delivers the completed statement as soon as practicable before transfer of title. If a required disclosure, or a material amendment, is delivered after the buyer has signed an offer, the buyer has three days after delivery in person, five days after delivery by mail, or five days after delivery of an electronic record when the parties have agreed to conduct the transaction electronically, to terminate the offer by a written notice to the seller or the seller's agent.

If you bought the house recently

Section 1102.6h is a narrower rule, on top of the rest of the article. It applies when a seller of a single-family residential property accepts an offer within 18 months after title was transferred to that seller, and the offer is accepted on or after July 1, 2024. The seller then also discloses room additions, structural modifications, other alterations, or repairs made since that title transfer that were performed by a contractor the seller contracted with, plus the contractor's name and contact information when the aggregate contract price is in excess of the dollar amount in Business and Professions Code section 7027.2. That section states the amount as $1,000, so the name-and-contact duty applies when the price is more than $1,000.

If the seller obtained a permit for work disclosed under that section, the seller provides a copy of the permit. If a third party obtained the permits and did not give the seller copies, the seller may instead tell the buyer that permit information may be obtained from that third party and give the contact information the third party provided. This section does not say that every unpermitted remodel in California must be disclosed this way. It is an extra duty for this recent-purchase case.

Concord required a permit anyway

Information Bulletin IB-022, revised May 18, 2023, says a kitchen remodel and a bathroom remodel need a building permit, including a replacement. A shower or tub enclosure needs a permit when it is new and when it is a replacement. A bid that calls the permit a waste does not change that bulletin. The side-by-side with nearby cities is in the permit guide. The work itself is on kitchen remodeling and bathroom remodeling.

Sections 1102, 1102.3, and 1102.6 require the disclosure on the transfers the article covers. They do not say a transfer is void because a kitchen or bathroom was remodeled without a permit. A buyer or a lender can still set conditions this page does not list, because those conditions are not in these statutes.

How Concord inspects work that was already covered up

Information Bulletin IB-036, effective October 31, 2018, is the city's written path for construction that was concealed before a building inspector approved it. The Building Official may require plans and specifications that meet the same criteria as a permit issued before the work. The permit description is marked "Construction Concealed Prior to Inspection." The code enforced is the code adopted when the unpermitted work is discovered, not the code from the year the work was done.

The bulletin says any of the listed inspections may be required, and several are at the inspector's discretion. A registered civil or structural engineer can sometimes provide written approval that lets the city waive a structural inspection. That exception does not apply to mechanical, electrical, or plumbing work. For a frame inspection, at least 20 percent of the wall or ceiling covering may have to come off, pictures or videos are not accepted for that phase, and the tests the code requires still have to be performed. For a shower or tub, wet walls are exposed, a test plug goes in the drain under the receptor, and the pan, tub, or finished floor is filled with water to the top of the threshold. Final inspection is the same kind of inspection as on a permit pulled before the work, and the inspector may require furniture, cabinets, or appliances moved if they block it.

Those are things the bulletin says the city may require. They are not a promise that a particular bathroom will pass, and they are not a list of fees.

What the city says about fees

The Building Code Enforcement page says any construction done without a permit may be charged double the inspection fees, plus additional hourly fees for staff enforcement time. The word on that page is "may." This site does not calculate that charge. The city's ordinary permit fee formulas, which are separate from that enforcement sentence, are on the permit fee guide.

What this referral will not decide

Concord Remodel Guide is an independent referral service, not a contractor, and we never do the work. We do not pull the permit, open a wall, or tell you whether to mark yes or no on a disclosure form. A licensed contractor does the construction. The written contract rules are in the contract guide. To ask one independent licensed general contractor to follow up, use the request form.

Selling with unpermitted work

Mid bid says getting permits are a waste and not needed. Not sure if that's an issue if we ever sell with disclosures.

For a kitchen or bathroom remodel in Concord, including a replacement, Information Bulletin IB-022 says a building permit is required. A bid that says a permit is not needed does not match that bulletin. On a single-family sale covered by Civil Code section 1102, the Transfer Disclosure Statement asks whether the seller is aware of alterations or repairs made without necessary permits. Answering that question is the disclosure the form asks for. It does not remove the city's permit rule. This is not legal advice.

In our market (Bay Area), will an unpermitted bathroom remodel be an issue?

This page has no Bay Area sales count, and it does not predict what a buyer or a lender will do. Concord requires a building permit for a bathroom remodel, including a replacement. The Department of Real Estate's printed disclosure form asks about alterations or repairs made without necessary permits, and about alterations or repairs not in compliance with building codes. Whether that matters in one sale is for the buyer, the buyer's lender, and your own adviser.

Can you sell a house with unpermitted work in California?

Civil Code sections 1102 and 1102.6 require a Transfer Disclosure Statement on the single-family residential transfers the article covers. They do not say the transfer is void because work was done without a permit. The printed form asks the seller about alterations or repairs made without necessary permits. Some transfers are exempt under section 1102.2. This page does not say whether your sale will close.

How do I legalize an unpermitted bathroom in Concord before selling?

Concord Information Bulletin IB-036 is the city's written path for construction concealed before a building inspector approved it. The city may require plans of the same kind as a permit issued before the work, and the permit description is marked Construction Concealed Prior to Inspection. For a shower or tub, the bulletin says the pan or tub is filled with water to the top of the threshold. The code applied is the code in effect when the unpermitted work is discovered. The Building Code Enforcement page says construction without a permit may be charged double the inspection fees plus hourly fees for staff time. The city decides what your bathroom has to open up. This site does not pull the permit.

Ask a licensed general contractor to follow up

Call or send a request with your address and whether this is a kitchen, a bathroom, or both. We pass your request to one independent licensed general contractor who serves Concord, CA, if one is available.